Private preview. Not published and not indexed.

Research opportunity · Concentration, Stack & Sovereignty

Did UK public bodies switch cloud providers after egress fees were waived?

Earlier version (v1)

This is RO-LD11-03 as it was published at v1, kept unchanged. The current version is v3; its changes are listed there.

Question

When UK public-sector cloud contracts came up for renewal before and after the 2024 egress-fee waivers and the CMA cloud investigation, how often did buyers move workloads to a different provider or add a second one, and did switching differ for workloads tied to Microsoft software licensing?

Not yet measuredMaster's thesisLow costNo study found

Why it matters

Regulators in the UK and EU have identified egress fees, interoperability barriers and licensing as switching constraints, and the three largest providers now offer approval-based egress credits to customers who leave entirely. Whether anything changed in actual buyer behaviour is the test of these remedies. Public procurement is one of the few places where cloud buying is visible in open records.

The debate lists this among what we still do not know: measured post-remedy cloud switching

Evidence that motivates it

A possible design

Assemble UK public-sector cloud contract awards from 2018 to the latest available year from Contracts Finder, Find a Tender and Crown Commercial Service framework (G-Cloud) records. Identify the hosting provider behind each award (directly, or through resellers and integrators using contract text and supplier lists) and link successive contracts of the same buyer for the same service into renewal chains. Outcomes: incumbent retained, full switch, or second provider added. Compare renewal decisions before and after the 2024 egress-fee waivers with an interrupted time-series design, adjusting for buyer type and contract size, and compare workloads tagged as Microsoft-stack (for example licensing-related terms in the notice) with others. Supplement with 10–15 interviews of public-sector cloud buyers on why they did or did not move.

Data needed

Open UK procurement data (Contracts Finder, Find a Tender, framework spend data where published); a hand-coded sample to validate provider identification through resellers; interview access to buyers.

Feasibility

Master's thesis. Low: public data and interview time; optional commercial procurement datasets would speed up cleaning but are not required. Provider identification through resellers is the main data-quality problem; the waivers applied market-wide, so the before/after comparison is descriptive unless a credible comparison group (for example licensing-tied workloads) is shown to differ. Public buyers are not the whole market, and results should be described as public-sector switching. The free-exit programmes announced by Google (11 January 2024), AWS (5 March 2024) and Microsoft (13 March 2024) require approval and give credits for complete exits within a fixed window; the CMA found they do not cover ongoing multi-cloud use and, for AWS and Microsoft, not partial switches. The treatment is therefore weaker than "fees removed", and the waivers do not apply at all to adding a second provider.

Has this been done?

The search found no study that does the core design (first-pass screen of 12 October 2026; not yet checked in depth).

No study measuring actual switching between cloud providers after the 2024 egress-fee waivers or the CMA investigation was found. Economic work on egress fees is theoretical (Biglaiser, Crémer, de Cornière & Mantovani); the one empirical inertia study found (Jin) measures switching between products of the same provider using proprietary data, by design not between providers. A UK procurement analysis (Tussell, 2022) describes public cloud award values but not switching. The CMA's final decision describes uptake of the providers' free-exit programmes as low, but does not measure between-provider switching. Between-provider switching in public procurement before and after remedies remains unmeasured as far as this screen could find.

How strong this evidence is

Nearest work found

Search queries used
  • cloud switching egress fees removal effect empirical study customers switching multi-cloud after 2024 egress waiver
  • public sector cloud procurement concentration hyperscalers analysis contract data G-Cloud OR TED OR Contracts Finder study
  • EU Data Act switching charges cloud empirical evaluation lock-in measurement firms
  • Jin Peng Wang 2023 switching costs cloud computing IaaS user inertia estimation
  • egress waiver uptake cloud switching evidence after 2024 study customers switched providers measured

Provenance

RO-LD11-03 v1. Drafted by Claude (SocioLens Project Lead), AI-drafted from the LD-11 debate on 2026-10-12. Checked by an independent AI reviewer with fresh context (not a person), 12 October 2026: every nearest-work citation checked against its source page; corrections applied. Not yet reviewed by a domain expert. This is a research hypothesis, not a finding.

All research opportunities